Monday, January 2, 2017

OPENWORK BLOUSES

12:07:00 AM
25 (562x700, 302Kb)

77. 
79 (552x700, 276Kb)

78. 
80 (558x700, 240Kb)

79. 
81 (556x700, 219Kb)

26 (542x700, 277Kb)

80. 
82 (563x700, 241Kb)

81. 
83 (563x700, 303Kb)

82. 
84 (552x700, 229Kb)

28 (565x700, 262Kb)

89. 
91 (554x700, 246Kb)

90. 
92 (567x700, 195Kb)

Sunday, January 1, 2017

PRETTY BLOUSES

11:52:00 PM
11 (542x700, 266Kb)

54 (542x700, 207Kb)

4. 
4 (542x700, 262Kb)

5. 
5 (542x700, 285Kb)

44. 
44 (542x700, 201Kb)

45. 
45 (542x700, 184Kb)

46. 
46 (542x700, 183Kb)                                     

 

26. 
26 (542x700, 269Kb)

27. 
27 (542x700, 293Kb)
80. 
80 (542x700, 160Kb)

81. 
81 (542x700, 193Kb)

82. 
82 (542x700, 203Kb)

VESTS..BOLEROS

1:06:00 PM



Bolero Size: 36.

Require: 200 g and 150 g of purple and white beads for seredinok elements "flowers", a needle, hook number 1.5 purple yarn (100% Coton, 560 m / 100 g).

Pattern tape: 5-4 scheme. The chart indicated the direct and inverse series.

The pattern of the composition "Wave": 5-1 scheme The scheme specified places braid connection.

Element "little flower": diagram

5-2. Knits from the center of the circle purple yarn.

The element of "Big Flower": 5-5 scheme. Knits from the center of the circle purple yarn.

The element of "leaf": 1-4 scheme, see the description of the model 1. knits purple yarn..

The basic pattern for a handbag "loin grid": 5-6 scheme. The chart indicated the direct and inverse series. Lilac knit yarn.
 
Bolero.

Description. The size and placement of ribbons see the pattern (Fig. 5-1, 5-2). Work is carried out in stages.

The first stage (rest). Take on thick paper (suitable and dense old cloth) details a pattern in size.Think of the composition, offer to connect it Bruges and Irish lace. Purple yarn braid knit according to the scheme 5-4. During the imposition of tapes required length fold it in waves, forming the top of the backrest. How to connect the braid waves tell diagram 5-1. Ready fragment of the Bruges lace baste the pattern to the wrong side up. Lilac and purple yarn Bind the required number of flowers and

leaves on the schemes 5-2 and 1-4. Lay them on the pattern seamy side up, in accordance with your composition. Try to trim all the edges. Purple yarn stitch adjoining side elements and ribbons. In places where large gaps, the elements connect Breeden. Work is carried out purple yarn. Finished parts, remove the pattern and slightly otparte.

The second stage (the shelf). Make the pattern details of its size. The length of the shelves, shoulder and side seams length should match the dimensions on the back. Think of the composition, suggest the use of Irish lace. Lilac and purple yarn Bind the required number of colors and patterns on leaves 5-2 and 1-4. Lay them on the pattern seamy side up, in accordance with your composition. Try to trim the side and bottom edges. Purple yarn stitch adjoining side elements. In places where large gaps, the elements connect Breeden. Work is carried out purple yarn. Finished parts, remove the pattern and slightly otparte. Second shelf vyvyazyvayut similarly, but in mirror image.

The third stage (fringe). Sew purple yarn shoulder and side seams.

On the contour of the edges (neck, shelves and bottomt rim according to the scheme 5-1. It  purple yarn braid, which is folded into a "wave". Knitting in a circle, connecting the braid during operation in the waves and the edge of the main part (see. Photo model). Tying the edge of the contour, you're done. Border width in this embodiment of 8 cm.

The fourth step (sleeve). Make the pattern details of its size. So it will be more convenient to form the round sleeves. Lilac yarn Bind 15 bands

braid according to the scheme 5-4. Three of the longest (length 18 cm) are centered. Then, on both sides for bevels place each strip is shorter than the previous one. Along the edges of the shortest (length 9 cm). During interconnected bands. Do not forget to connect on the sleeve seam. Purple yarn connect sleeve to the main part on the edge doused. On the contour of the lower edge of the rim  scheme 5-1. It  purple yarn braid, which is folded into a "wave". Knitting in a circle, connecting the braid during operation in the waves and the edge of the main part (see. Photo model). Tying the edge of the contour, you're done. Second Hand  similarly.

Fifth stage (assembly). All edges of the contour of a purple tie yarn and pattern according to the scheme 5-3. At the midway colors sew beads.

Handbag.

Description. First, pick up something from the old already unnecessary small handbags or clutches, and you can buy a new cheap handbag. Color tone to pick up the yarn. If this is hard to do, it will approach the universal color - beige, white or black.

To give a new image of her purse (it's very easy), it is necessary to tie the yarn into garments model tone.

The size and direction of knitting look at the pattern (Fig. 5-3).

Initially, purple yarn vyvyazhite canvas size 19 x 60 cm pattern "loin grid '5-6 scheme. Tie his pattern under the scheme of 5-7. Obsheyte handbag  this web. Think of the composition of flowers and leaves,  them and sew items on the bag, folded them into a composition. We offer for the imposition of circuit elements 5-5 and 1-4.



2.
62 (479x359, 106Kb)

3.
63 (478x262, 48Kb)

4.
64 (468x418, 121Kb)

5.
65 (334x131, 34Kb)

6.
66 (479x359, 93Kb)

7.
67 (479x359, 144Kb)

RUGS....MK

7:55:00 AM

 
  4979645_37490_original (700x466, 248Kb)

In order to make your hands pompons home need cardboard, yarn and a needle with a large eye and scissors.
Using a compass draw two circles on the cardboard with a diameter of six and a half centimeters, and even within a circle diameter 2,2sm. Cut the resulting circles and inner circles and add up these patterns on one another.
 4979645_77054fef43022a7323a11c9136f11e1e (677x508, 117Kb)

Next, we need multi-colored woolen threads, such as blue and white. Threads may be the same quality and thickness, but this is not essential. Thread length should be no longer than 3 meters. For convenience, they should be rolled up into a ball.
Wrapped, blue thread our templates of a circle of cardboard. Doing two or three turns, the remaining tail thread anchoring under already wound coils. Yarn wound freely.
4979645_foto0009 (520x390, 56Kb)
So we should not try to cover the entire surface at once, the better it will do in the next row. Wrapping templates twice, stop. At the end of the article you can find some simple and illustrative master classes on making pompons own hands with photo instruction, where everything is quite clearly described.

So, let's continue. Further, by the same mechanism wrapped in two rows pattern with white thread. Then the whole process starts over again, ie, do beaming at first blue, then white thread on two rows. After the thread is finished, the tail again, hiding under the coils, and is taken following the thread of the same length.
During that as you'll twist template strands will need to add a few times. From the thickness of the yarn depends on how many turns will be.
If you make a pompom dense, using fluffy yarn, toys of them will be a great form.
After the hole in the template will be small and will be uncomfortable to stretch through it thread by hand, you can use a needle with a large ear. It is passed in the thread and continue the wound. When the inner circle will be closed the template is ready. Running a little ahead to say that you can make a very nice mat pompons with their hands, when you produce a sufficient amount of soft balls. A video tutorial posted below will help you with this.
pompons with their hands
To assemble the required pompom yarn length of about thirty centimeters.
Threads on the template it is necessary to accurately move, to find them under the cardboard templates. Use scissors to cut the thread in half between the cartons. Remember to cut the thread must be strictly between templates!
Stretches between cartons prepared thread and winding it produced a beam, followed by tying a thread on a double knot. Then remove the template, if you wrapped the thread too tight, they can be cut off. Spread the resulting pompom trim and rough skin. That's all! If you get the hand to make pompoms quickly, you can make a very stylish and soft mat of pompons. Easily




pompons with their hands
How to tidy your pom-poms hands of woolen thread. Mini Master Class
pompons with their hands
Make pompons own hands without the help of patterns cut from cardboard. Master Class
And here's one more tips on creating FLOORMAT

Here is the prototype of an Internet and our (our, in my opinion, much nicer :)): Process and details: 1.Rendering and creating scaled circuit in Excel (slightly changed form to bear prettier). 2. Preparation according to circuit patterns of parts. 3. Calculation of number of materials and procurement.  Yarn Alize Superlana Maxi (75% acrylic, 25% wool, 100 g / 100 m), very soft, not too twisted, when creating pompons easily raspushivaetsya and creates volume.               Milk - 8 skeins (enough even with the additional pompons),               beige - 1 roll (enough butt)               pink - 1 roll (left virtually the whole) Molyneux dark chocolate color. For the base piece of white felt Mert per meter (it took less than: 90cm to 60cm). 4. Education crochet circle and oval, as well as technology training pompons. 5. Vyvyazyvanie parts and training pompons in the right number ve. Pompon initially produced 60 pieces. milk for the whole bird and one pink for nozzle diameter of 7 cm + two pink ears to 5 cm in diameter, and then added another 8 pieces. milk for the carcass. 6. Stripping knitted parts and trim pompons. 7. Sew all the details to the base.
mat-mishka_iz Ineta mat-mishka_2_umensh


scheme


1.
62193205_kovrik_opis (656x699, 158Kb)

2.
62193264_kovrik_shema (699x469, 311Kb)

3.
97536996_4526795_71811208_tapete_borboleta_de_pompom (700x527, 176Kb)

4.
b207edb13cdde8edb8907967be9a7199 (450x303, 134Kb)

5.
moi_podelki_001 (360x480, 46Kb)

6.
77054fef43022a7323a11c9136f11e1e (677x508, 117Kb)