Tuesday, November 6, 2018

SET FOR BABY

COLOR KIT for baby

Depending on the color scheme, you can knit both a boy and a girl.
 (469x699, 117Kb)
 (493x699, 85Kb)
 (468x698, 53Kb)
 (491x699, 73Kb)






Knitting for children Kit


You will need: 
500 g of white yarn (100% wool; 50 g - 150 m); 
Knitting needles number 2 and 3.5. 

Gum: alternately 1 purl, 1 front. 

Density of knitting: 23 points (connected with needles No. 3.5) and 36 points (connected with needles No. 2) - 10 cm. 

Pattern from "braids" (needles No. 3.5): knit according to pattern 18a. The first 2 p. - transitional rows from an elastic band to a pattern from "braids". Rapport, between the crosses, repeat in height and width. Knitting density: 30 n. / 43 p. - 10 cm. 

"Braid" (needles No. 3.5): knit under the scheme 18a on the loops between the arrows (1st and 2nd p. - transition rows). The repeat between the crosses is repeated in height. 
Knitting density: 14 points - 4 cm, 43 p. - 10 cm

Patent gum (needles number 3.5): # knit under the scheme 18b. The resulted rapport is repeated in width and height. 

Wide semi-patent elastic (needles number 3.5): knit under the scheme 18c. The resulted rapport is repeated in width and height. The density of knitting (both patterns): 26 n. / 43 p. - 10 cm. 
Pullover 
Before and back with single-cut sleeves: dial 63 p. (28 cm) on the needles - the bottom edge of the front and knit with an elastic band 8 p. (2 cm). Work to continue the pattern of "braids". 60 p. (14 cm) from the elastic for bevel sleeves add in each 2nd p. 12 times, 3 points and further 84 p. (20 cm) knit straight fabric. For the neck of the front (bottom line of the drawing): close the middle 14 s and subtract them from both sides in each 2nd p. 1 time for 5 p., 3 times for 2 p. And in each 4th p. 2 times for 1 p. And another 6 p. knit straight linen.

Connecting the part up to the line of the middle of the sleeves, from the edge of the neck to the arrow (see the drawing) close the fasteners with 14 p., Loop again in the next row. For the back of the neck: in every 2nd p. Add on both sides 2 times 4 points and 1 time 5 points each and dial 14 points between them. Link the front of the backrest symmetrically and lower the loops in the transition from a braid to an elastic band.

Along the edges of the cuts for fasteners from the back side, dial 14 p. On the front side and knit 4 r, (1 cm) with an elastic band - allowances for fasteners. Tie an elastic band cuffs, typing on the spokes of 41 p. (18 cm), and transfer the loop to the auxiliary thread. For the front neckline, dial 45 pins (20 cm) on the needles, 37 pins (16 cm) for the back neck collar and knit 6 p. (1.5 cm) with an elastic band, then »transfer the loop of the knots to an auxiliary thread. Pullover details stitched. Bakey prikretlevat along the edge of the neck.

Jumpsuit: for each half of the jumpsuit, use 43 pp. Needles and edge loops (18 cm) for the bottom edge and knit 8 p. With an elastic band. (2 cm). Then continue knitting, distributing the loops of the patterns in the following sequence: 18 p. Wide semi-patent gum, 14 p. "Braids", 37 p. At the same time in the 1st p. in areas of a wide semi-patent gum, tie out of the broaches 2 pp, each crossed in the wrong direction.

In the transition from the rubber band to the "spit", the addition of loops should be carried out according to scheme 18a. Then 14 p. (3 cm) knit straight fabric. For stepping bevels in every 12th p. on both sides, add 4 times in 1 p. For stepping roundings on both sides, close on 3 p. and then in each 2nd p. reduce 3 times by 2 points. Connect the halves of the jumpsuit along the front and rear middle seams (see arrow in the drawing) and, continuing the patterns, knit another 60 p. (14 cm) in a circle, at the same time to fit on parts of a wide semi-patent gum, 2 each of them. knit pattern knit together izn. (except for "braid"). 

For the cord, make the 3rd row of elastic bands openwork - alternately:
1 out. and 1 persons. knit together the front, make 1 nakida, in the next row nakida knit purl. In areas of "braid" holes are not tied. Having tied up another 6 p. In height, work on areas connected by a wide semi-patent eraser will continue with a semi-patent eraser. For armholes: after dividing the work, close by 5 points. For the front mouth: close the middle 7 points and on both sides lower them in each 2nd p. 2 times, 3 points, 2 times, 2 points, and in each 4th p. 2 times for 1 p., Then for 6 p. on each side of the knit straight fabric.

For the neck of the back: close 19 p. And on both sides lower them in each 2nd p. 2 times 2 pts and 2 times 1 p. Beyki tie a rubber band to the armholes by typing 23 p. (9 cm) on the spokes. For the front neckline, dial 45 pins (20 cm) on the needles, 39 pins (16 cm) for the back neck, and knit 6 p. (1.5 cm) with an elastic band, then transfer the loop of tapers to auxiliary threads. Run seams. Bakey prikretlevat. Along the shoulder edges of the back rest on the spokes on the front side of 16 p. And 4 p. knit rubber band - allowances for fasteners. 
In the openings of the openwork p. thread a cord of 85 cm long twisted out of yarn. 

Cap
Front: dial 35 knitting needles (15 cm) and knit 6 p. (1.5 cm) elastic. Continue knitting, distributing the loops of the patterns in the following sequence: 20 p. (7 cm) of a semi-patent gum, 14 p. "Braids", 1 p. Of the front smoothing line for the fold line, 7 p. Of garter stitch (front and back rows - facial loops) . On the “spit” section in the transitional row from the elastic band, knit out 7 s. According to scheme 18a. 120 p. (28 cm) from the beginning of the "spit" 4 p. tie a rubber band, while in the 1st p. subtract 7 loops added to the “spit” area.

Occipital part: dial 13 p. (5 cm) on knitting needles and knit 6 p. (1.5 cm) elastic. Continue knitting garter stitch (face and purl rows - face loops). For lateral bevels, add on both sides in each 12th p. 2 times for 1 p. And another 12 p. knit straight linen. For rounding the top of the part, subtract in each 2nd p. 6 times 1 p. And close the remaining 5 l. Hats sew details. Turn the front edge to the wrong side of the fold line and sew. Along the bottom edge of the cap, thread a 80 cm long cord twisted from yarn, attach pompons to the ends of the cord.





2 comments: