Friday, January 6, 2017

SUMMER HAT & SKIRTS ,JACKET AND SWEATER.

 (640x480, 79Kb) (305x480, 76Kb)



 (588x600, 87Kb)
 (588x392, 84Kb)
 (250x250, 21Kb)
 (500x500, 36Kb)
sidushka (250x250, 15 Kb)
 (588x392, 94Kb)
 (250x250, 20Kb)
 (250x250, 20Kb)
 (250x250, 13Kb)
 (250x250, 17Kb)
 (250x250, 17Kb)
 (250x250, 15Kb)
 (250x250, 17Kb)
 (250x250, 18Kb)
 (250x250, 18Kb)
 (250x250, 20Kb)
 (250x250, 19Kb)


BLOUSE BY NATALIA PELYKH



pink_flowers_set_22 ​​(700x525, 252Kb)

pink_flowers_set_1 (700x465, 255Kb)
Size: 0-3 months

You will need: 200g of yarn Mondial Extrafine (100% merino wool, 50g - 175m) of pink color;
spokes №№ 2.5 and 3, the hook №2.5;
markers for loops;
3 buttons with a diameter of 7 mm.

Garter Stitch: knit facial loops in the right and wrong ranks.

The front surface of: facial loop knit in the personal series, and purl loops in backstitches ranks.

Wrong expanse: knit purl loops in series and facial facial loop in backstitches ranks.

BLOUSE:

The order of performance: blouse is knitted in one piece to the line armholes.
On the dial needles №3 202 loops and knit 4 rows garter st, then continue knitting as follows: Krom, 3 loops garter stitch (for fastening bracket), the front surface of the loops 37, 20 loops purl waste, 80 loops of the front surface of,. 20 loops purl waste, 37 loops of the front surface of 3 loops garter stitch (for fastening bracket), chrome.
To form a rounded front shelves to add on both sides of each row of 2m before and after chrome. 3 times at 1 loop. To add a loop provyazyvat loop of the previous row pulling the front. At the same time vyvyazyvayut side panels on the underside surface of the diagram.
At the height of 16.5cm from the edge of typesetting go to the surface of knitting purl.
At the same time perform a first opening for the buttons on the right strap fastener. To do this, knit 2 sts together persons., Nakida, and in the next row knit nakida front.
Repeat holes for the buttons twice, placing them at a distance of about 3 cm apart.
Knit 1 cm purl stitch, knitting divided on the back and front shelves, closed on 7 loops on either side of the purl loop, a total of 15 loops for each armhole.
Then continue knitting back. To form armholes in each row by 2m cut armhole 5 times with 1 loop. Reducing loops to perform at a distance of 2 from the edge loops, provyazyvaya 2 loops together purl. Continue knitting smoothly. At a height of 10 cm from the start knitting purl embroidery close all the loops. Overall height 27 cm detail.
The front shelves knit with the same cutouts for armhole. At a height of 7 cm from the start knitting purl satin stitch to close on both sides for the neckline 12 loops, and then cut the loop from the neckline in each 2 series, provyazyvaya 2 loops at a distance from the edge 2 sts together purl. At a height of 10 cm from the start knitting purl embroidery close all the loops. . Overall height 27 cm detail
Sleeves: on №3 spokes dial 62 loops and knit 4 rows garter st, then continue knitting as follows: Krom, 20 loops of the front surface of 20 loops purl waste, 20 loops facial waste, chrome.. The side surface of the insert purl knit according to the scheme. At the same time to form the lateral bevels sleeves allow the sleeves on both sides in every 8th row 1 st. At a height of 17 cm from the start knitting the sleeves to start vyvyazyvanie doused. For this close on both sides at 7 loops, then in each second row to cut from both sides 7 times by one loop provyazyvaya distance 2x loops from edge 2 loops along the front at the start row and the simple pulling of the end of the series (1 to remove the loop following knit front, then stretch shot knit loop through). Further, on both sides close to each of 2m row 2 to 3 times the loop, after which the remaining closed loop.
Assembling: moisten the product and pull on the pattern size. Leave to dry completely. Run the shoulder seams and sleeves seams. Enclosing sleeve. Tie a hook edge products as follows:
1st row: knit in each column an edge 2 without nakida.
2nd row: * 5 columns with nakida in the loop of the previous row, skip 1 st in next st knit connecting column, skip 1 st, repeat from *.
Assign flower, sew it on top of the shelves on the right lined by flower lace.

The scheme of knitting of the side panels:
pink_flowers_set_scheme (700x225, 116Kb)
Booties:

The order of performance: knitting booties knitting begins with the soles.
Soles knit in garter stitch. At spokes dial №2.5 5 loops. At the end of each of the following four ranks to add on two loops, the total of 13 loops. Knit 20 rows unchanged, then the beginning and end of each row 2nd add 2 × 1 loop. Knit 6 rows evenly in the total 17 loops. Proceed to decrease the loop at the beginning of each row of 4 × 4 and one loop times - two. Close the remaining 5 sts.
To form the upper part of the shoe on circular needles dial on the soles of 72 loops around the perimeter. Knit 1 row purl loops. Mark marker mid front of the shoe. Continue knitting the front embroidery, while in each row 2 sts before marker provyazyvat simple broaching (1 to remove the loop, knit 1 front and stretch shot knit loop through) and two loop after marker provyazyvat along the front. Knit 9 rows in such a way, an opening for the cord, this knit * nakida, 2 loops along the front, repeat from *. In the next row nakida provyazyvat facial loops. Knit 2 rows of the front stitch, close all the loops.
Top shoe tie crochet as follows:
1st row: knit in each column an edge 2 without nakida.
2nd row: * 5 columns with nakida in the loop of the previous row, skip 1 st in next st knit connecting column, skip 1 st, repeat from *.
The holes to pass a series of openwork lace. Assign flower and sew the front of the booties.


Bandage on his head:

Order of operation: on the spokes №2.5 dial 112 loops and knit in garter stitch 6 rows, and then close all the loops.
The dressing mattress stitch seam and tie the hook as follows:
1st row: knit in each column an edge 2 without nakida.
2nd row: * 5 columns with nakida in the loop of the previous row, skip 1 st in next st knit connecting column, skip 1 st, repeat from *.
Assign flower, sew it on the strip at the seam and lined by flower lace.


FLOWERS:

The flowers for decoration kit to knit on the diagram.
pink_flowers_set (614x608, 129Kb)

RЎRЅRёRјSЋSЋSЋRѕRє (523x403, 618Kb)


RЎRЅRёRјRѕR¶R¶R¶R¶Rє1 (638x383, 231Kb)

3.
RЎRЅR¶SЌSЌRґR "RёRјRѕRє2 (619x491, 283Kb)

4.
RЎRЅRёR¶RѕSЂRїRјRѕRє3 (584x496, 277Kb)

5.
RЎRЅRёR¶RґSЂRЅRјRѕRє4 (579x280, 156Kb)

6.
RЎRЅRёSЂSЂR "RґRјRѕRє5 (627x600, 389Kb)

7.
RЎRЅRёRјRѕR¶R "RѕRѕRє6 (616x158, 87Kb)

8.
RЎRЅRѕRѕRѕR "RёRјRѕRє7 (587x472, 350Kb)




No comments:

Post a Comment