Tuesday, January 9, 2018

JACKET, DRESS & PATTERNS

1:32:00 PM

Jacket and sarafan. Continuous knitting









ELEGANT JACKETS

6:24:00 AM



3925116_901823d53f56 (545x700, 326Kb)3925116_RnRprWMak0g7p (700x630, 216Kb)3925116_3uhxh3TXANtLP8RoHN (486x700, 249Kb)3925116_hYGqDaTxuzELkvEcvie (700x601, 254Kb)3925116_JzO9N1gami (574x700, 256Kb)




Warm jacket from "grandmother's squares"

3266779_1teplyjzhaketizbabushkinyhkvadratov (495x700, 59Kb)
 
Warm jacket from "grandmother's squares"A warm and cozy jacket from the magazine Knit & Mode No. 12 2012 is crocheted by No. 5 of 1000 g of Lanas Stop Top Merino (52: merino wool, 48% acrylic, length 125 m / 100 g). The size is 46-48.

Warm jacket from "grandmother's squares"Tie 87 squares according to scheme 2. Connect the squares according to the pattern-pattern with the purl. To join the squares, tie a column without a crochet between groups of columns of squares, 3 air loops.
A video tutorial on connecting motifs you can see here .
The edges of the shelves and the neckline are tied with 3 rows of rims according to scheme 1, and the bottom of the sleeves is the 1st row.
Slightly strip off the jacket from the wrong side.


FLORAL SHAWLS

4:46:00 AM

















CROCHET CARDIGAN & BLOUSES

4:43:00 AM

 


image (32) (471x700, 316Kb)

2.
image (33) (700x521, 347Kb)




6632501528862587801 (525x700, 396Kb)




6632548807862587224 (509x700, 310Kb)

.
6632270631420761696 (509x700, 186Kb)

Monday, January 8, 2018

SOLAR JACKET

11:47:00 AM



297125-91f41-79618191-m750x740-ubf697 (480x640, 341Kb)

297125-f3514-79643607-m750x740-u12737 (467x700, 186Kb)

297125-7c8fa-79643781-m750x740-ue7ef2 (507x700, 218Kb)

297125-cd8d2-79643598-m750x740-ub04fb (507x700, 234Kb)

297125-e15dc-79643599-m750x740-u3d044 (507x700, 220Kb)

297125-48532-79643603-m750x740-u3e4f1 (507x700, 208Kb)

297125-2b60e-79643600-m750x740-uee59e (700x508, 179Kb)

297125-9bf2b-79643604-m750x740-u7441f (507x700, 201Kb)

297125-c6b18-79626361-m750x740-ud1e51 (1) (655x699, 435Kb)

MODELS FOR THE BATHROOM

4:52:00 AM






 (517x698, 67Kb)

 (519x698, 72Kb)
 (509x699, 65Kb)
 (510x698, 60Kb)
 (526x699, 68Kb)

PRETTY COATS

4:46:00 AM







DESCRIPTION OF WORK 
Begin knitting from the lower bars: 2 front bars - dial 17 st and knit faces. smooth 57 cm, move the hinges to the auxiliary. spoke.Similarly, connect the second bar. Then dial 35 p. - one side lath. Knit people. smooth 57 cm. Move the hinges to the back of the spoke. Similarly, connect the second bar. Next, join the straps and knit with a solid cloth. To this end:.. 17 n strap forehand +15 claim dial +35 claim side bar + 25 n dial +35 claim side bar + 15 n dial + 17 n strap forehand = 159 n......  Knit  straight blade faces. smooth to the armhole. After 21 cm the canvas is divided into three parts: the right shelf, the back, the left shelf. Then finish all the parts separately. For armhole close from 38 to 43 points and from 116 to 121 points. 

BACK
First knit the backrest loops (middle part of the fabric). For the armhole, close 2 x 2 n., 2 x 1 n. After 17 cm from the beginning of the armhole, close 20 points to cut the neck and both parts to finish separately, while from the side of the neck, close in each 2 nd row 2 x 1 n. The remaining 20 items 

should
be closed. To cut the neckline, close in each 2 nd row 1 st from the beginning of knitting the armhole. The second shelf is  knit similarly. Sew the shoulder seams. 

Splints
wedges crochet on skhe¬mam 1 and 2 for knitting the lateral gussets (x2} 1st row knit from 5 arches and rear gussets (2 pcs.) Start with the number 1 7 arches of ce 

SLEEVES
Dial on knitting needles 50 sts and  knit 23 cm of faces. smooth. For the bevels of the sleeves in each 6th row on both sides add 1 ppt. For the pellet of the sleeve on both sides, 1 time 3 points, 2x2 pts and 20 times 1 pt. Remain the remaining ones directly. Sew a sleeve. At the bottom of the sleeve (down from the elbow) connect 12 rows of "pattern for wedges" 18 repeat the row 12 times. 

ASSEMBLY
Sew ready wedges. At the edges of the strips of the coat on the circular knitting needles, sew loops and  tie the straps for buttons with garter stitching 4 cm. 
For the collar along the edge of the neck, draw the loops on the circular knitting needles and tie the 12 cm garter stitch, while in each 2-row row along the edges of the collar add 1 etc. 
Bind the belt with a double rubber band 6 cm wide and 150 cm long.




THE SIZE

38/40

YOU WILL NEED

Yarn (100% natural wool, 68 m / 50 g) - 100 grams of brown, yellow, orange, red, reddish-brown, purple, bright pink, burgundy, light green, blue-green, blue, color. powder, olive and 50 g of lilac, blue and mint; hook number 6; 5 buttons of orange color with a diameter of 24 mm.

PATTERNS AND PATTERNS


MAIN PATTERN

The number of loops of the initial row is a multiple of 3 + 2. 

Knit according to. 1. Start with loops before the rapport, repeat constantly repeat, end with loops after the rapport. 

Execute 1 time for the 1st and 4th rows, then constantly repeat the 3rd + 4th series, while observing the sequence of colors.

Sequence of colors in the main pattern
2 rows of olive, light green, yellow, orange, red, reddish-brown, brown, burgundy, bright pink, color. powder, lilac, violet, blue, blue, blue-green, mint thread, repeat from *.

SQUARE

Execute a chain of 6 bp. and close in the ring using 1 connection. Art. 

Knit cf. scheme 2 in a circular array. Each round-robin series starts with 3 points. instead of the 1st st. с / н and finish 1 соед. Art. in the 3rd c. replacement. 

The series can be executed 1 time, while observing the sequence of colors.

Sequence of colors 1
For 1 round row mint, red, orange, purple and brown thread.

Sequence of colors 2
On 1 circular row of blue, orange, bright pink, light green and blue thread.

Sequence of colors 3
On 1 circular row of light green, bright pink, purple, mint and burgundy thread.

Sequence of colors 4
On 1 circular row of olive, yellow, red, purple and blue-green thread.

Sequence of colors 5
On 1 circular row of light green, orange, bright pink, thread of color. powder and brown thread.

Sequence of colors 6
On 1 circular row of blue, orange, red, light green and blue thread.

Sequence of colors 7
On 1 circular row of light green, red, bright pink, floss. powder and maroon thread.

Sequence of colors 8
On 1 round row lilac, purple, light green, orange and brown thread.

Sequence of colors 9
On 1 circular row of yellow, bright pink, purple, mint and burgundy thread.

Sequence of colors 10
On 1 circular row of olive, yellow, red, purple and blue thread.

Sequence of colors 11
On 1 circular row of violet, a thread of color. powder, bright pink, blue and blue-green thread.

Sequence of colors 12
On 1 round row of yellow, olive, orange, blue and burgundy thread.

Sequence of colors 13
On 1 circular row of mint, bright pink, light green, olive and blue thread.

Sequence of colors 14
On 1 circular row of light green, purple, blue-green, orange and red-brown thread. 

Sequence of colors 15
On 1 circular row of bright pink, lilac, blue, blue-green and burgundy thread.

Sequence of colors 16
On 1 circular row of mint, bright pink, light green, olive and yishin-green thread.

PLANK PATTERN

Rapport = 4 loops. Pattern knit acc. Crochet pattern 2 (green icons) right at the edge of the squares. Run once in the 1-3 rd series.



DENSITY OF KNITTING

13 points x 7 p. = 10 x 10 cm, is connected by the main pattern; 
the square is 16 x 16 cm.

PATTERN



COMPLETING OF THE WORK


BACK

With an olive thread execute a chain of 83 bp. + 3 cp. lifting and knit basic pattern according to. sequence of colors. 

After 64 cm from the initial row, skip the armhole on both sides for 10 cm. 

On the remaining loops, finish working 80 cm from the initial row.

LEFT SHELF

Run on 1 square according to. sequences of colors 1-5 and in this sequence sew in a strip, thus to enter a hook only for a back wall of loops.

RIGHT SHELF

Knit, like the left shelf, but execute on 1 square according to. sequences of colors 6-10.

LEFT SLEEVE

Run a chain of 29 bp. + 3 cp. lifting and from ** knit basic pattern according to. sequence of colors. 

For the bevel of the sleeve, add on both sides in each 5th row of the starting row 7 x 1 st acc. pattern = 43 p. 

Simultaneously, after 13 cm from the initial row, pass the middle 21 p. = 16 cm and both sides knit further separately. 

After 61 cm from the initial row finish the work. 

Run on 1 square according to. sequences of colors 11-13 and sew in the strip, as described above. Strip sewn into the sleeve.

RIGHT SLEEVE

Knit like the left sleeve, but execute the squares according to. sequences of colors 14-16.

ASSEMBLY

Make shoulder seams on both sides of 12 cm long. Sideways edges of backrest to sew to the bottom 64 cm of shelves (outer 5 cm armholes of backrest now refer to shelves). Sew up sleeves. Stitch the sleeves. 

For straps fasteners tie the sides of shelves patterned strip, while doing on the 1 row of bright pink thread, thread color. powder and purple thread. Then perform another 1 row of burgundy thread on the sides of the shelves and the edge of the neck. 

Sew the buttons to the left shelf, while the upper sewn at a distance of approx. 6 cm from the top edge, the rest with an interval of approx. 11 cm. Button to fasten through the holes of the pattern.