Monday, January 27, 2020
Original summer cardigan.
CARDIGAN
8:46:00 AM
New
Friday, January 24, 2020
how to crochet a circle and oval
patterns
8:10:00 PM
New
PRETTY RED CARDIGAN
CARDIGAN
7:46:00 PM
New
Openwork cardigans (ribbon lace)
CARDIGAN
7:38:00 PM
New
Orange cardigan with an openwork pattern
Thursday, January 23, 2020
PRETTY SIMPLE BLOUSES
BLOUSES
3:25:00 PM
New
CROCHET DRESS BASED ON D & G * FEATHER ANGEL *
DRESSES
3:20:00 PM
New
Beautiful dress, which can be a highlight of your wardrobe, and you draw to the attention of passersby and delight loved ones.
Dress fit in two directions from the waist to the bottom and up. Regarding yarn: yarn can be taken with a good krutkoy- Max, Anna, TULIP, or the one that most appeals to you and to which you are accustomed. Consumption - 300-400 grams of yarn should be enough, it all depends on which version you are planning to knit mini, midi or maxi, it is the flight of your imagination and of course - patience.
Here's a version with a sleeve
Well to begin dismantling a detailed pattern of the MC, it is no translation, but I think that we have the strength to dismantle ALL
Schemes which will knit
I started knitting for 1 circuit.
My sample from Forever linked by Alize
on the scheme was repeated 5 times, start repeating arches of 6 ... you will knit only one side, and the second time when the tally link desired length.
So you will need to do the expansion in the skirt for Klesha
I start knitting finishing of Tulip
I start knitting finishing of Tulip
http://fotki.yandex.ru/users/olesya-pismack/view/899447/
is such gusenichka get a long 60 cm
Top tracks
well and the bottom
General view of the
increase in the top
boost to the bottom
increase in the top
boost to the bottom
I found a scheme without otryva- can try
I knit without transition, the transition to the next strip of knitting 10 VP, then everything under the scheme, 10 If the EP will not be enough then do 11-13, as it will be convenient, and then on top of it is already possible to dial the loop belt.
Tied the first row of feathers, non-terminating thread dial 10 + 13 EP for the next row of feathers all as under the scheme, etc.
photo can be clearer. I reach the bottom of the right side, climb up the left tieing etc.
photo can be clearer. I reach the bottom of the right side, climb up the left tieing etc.
1.
2.
3.
4.
5.
6.
7.
8.
9.
2.
3.
4.
5.
6.
7.
8.
9.